Skip to content

Lean Six Sigma continuous improvement

Bordeaux and Nouvelle-Aquitaine, remote across France

A process is costing you too much: rework, delays, tickets that keep coming back, hours spent fixing things. You know it, but nobody has the time to take it apart and understand why. I step in on a short assignment, 5 to 10 days at a fixed price, using the DMAIC method: I map and measure the process, identify the real causes, build the improvement plan and leave control indicators behind. Six Sigma Black Belt (CSSC, 2023).

Book a free call

The problem I solve

Costly processes are rarely the ones people think. The visible symptom (a delay, a backlog of files, a queue of tickets) often hides a cause two steps upstream, in another team, in a check that has become pointless or a double entry nobody questions any more. With no measurement, every department defends its own explanation and nothing moves. I replace opinions with figures: the process is measured as it really runs, the causes that genuinely weigh are traced, and the improvements chosen are those that return the most for the effort. Then the gain is checked to make sure it lasts.

How I work

Define and measure

I pick with you one process, and one only, with its scope, its customer and its current cost. I map it step by step with the people who run it, then measure what matters: lead times, volumes, rework, time spent.

Analyse the causes

With the data in hand, I look for the causes that genuinely weigh, not the ones quoted in meetings: cause-and-effect diagram, variance analysis, observation on the floor. As a rule, a handful of causes explains most of the cost.

Improve

For each cause retained, I propose an improvement sized in gain and in effort, and prioritise it with you. Simple actions start straight away; the others go into a plan with an owner and a date.

Control

A gain that is not measured evaporates within months. I leave simple control indicators, kept by your own teams, with an alert threshold and a short ritual for reviewing them. That way you know whether the improvement holds without me.

Real example

Where this comes from: on the migration of a 500-million-document platform for La Banque Postale and Caisse des Dépôts, licence costs were brought down from 600,000 EUR to 20,000 EUR a year. That is a result of project steering and technical redesign, not of a DMAIC assignment: it says where I speak from, not what I promise.

Read the case study

Who it is for

  • Operations directors with an identified costly process and no method to tackle it
  • IT departments whose support processes (incidents, requests, changes) loop back on themselves
  • Department heads who want figures before asking for resources
  • SMEs with no continuous improvement function in house

What you get

  • A map of the process as it is actually practised
  • A measured picture of the current cost: lead times, volumes, rework, time spent
  • A root cause analysis, ranked by real weight
  • A prioritised improvement plan, with owners and dates
  • Control indicators kept by your teams after I leave

Frequently asked questions

Why such a short assignment?+

Because a well-bounded process can be measured and analysed quickly when given full attention. The 5 to 10 day format forces a choice of a single process and a focus on the causes that weigh most, rather than an exhaustive report nobody reads. If the scope is wider, it is split into several assignments.

Do my teams need to know Lean or Six Sigma?+

No. I bring the method, your teams bring their knowledge of the ground, and that is what counts. The tools (mapping, measurement, cause-and-effect diagram) are explained as they are used, on your own case. The people who take part leave able to run the approach again on another process.

What experience do you have of cutting costs?+

My expertise comes from steering projects, not only from the Black Belt. On the migration of a 500-million-document platform, licence costs were brought down from 600,000 EUR to 20,000 EUR a year: a result of project steering and technical redesign, not of a DMAIC assignment. The DMAIC method exists precisely to make that kind of gain repeatable, process by process.

How much does it cost?+

Fixed price, from 3,000 EUR excl. VAT. The quote is set after the first call, depending on the scope of the process, the number of teams involved and the duration chosen, between 5 and 10 days. The fixed price covers measurement, analysis, the improvement plan and the control indicators. The first call is free.

The programmes

A process that costs too much

Book a free first call. You describe the process and what it costs you today, I tell you whether a 5 to 10 day assignment can answer it.